"Really pleased with the work Bartelt recently did on our driveway. They did some infrared work on it and then filled cracks and sealed it. They were extremely responsive from our original request for an estimate on through completion of the project. They kept us apprised of their schedule and were p..."
Diane Kleiboer
After Your Maintenance Project Is Complete
We recommend staying off the freshly seal coated surface for at least 48 hours (36 hours of direct sunlight is best), and longer if your driveway/parking lot is tree covered or shaded as drying time takes longer in these instances.
Use caution when driving on and turning your wheels on your freshly seal coated surface as the wheel turning can scuff the surface. This is not a warrantied item.
Enjoy your freshly seal coated driveway or parking lot.
We recommend staying off the freshly seal coated surface for at least 48 hours (36 hours of direct sunlight is best), and longer if your driveway/parking lot is tree covered or shaded as drying time takes longer in these instances.
Use caution when driving on and turning your wheels on your freshly seal coated surface as the wheel turning can scuff the surface. This is not a warrantied item.
Enjoy your freshly seal coated driveway or pakring lot.